AID Implementation Plan Skill (Phase 3)
Phase 3 is the bridge between design and development. This skill ensures all planning artifacts are consistent, consolidated, and ready for development.
🚀 PHASE 3 ENTRY - MANDATORY WELCOME MESSAGE
When user enters Phase 3, Claude MUST display this message FIRST:
╭─────────────────────────────────────────────────────────────╮
│ │
│ 🎯 Welcome to Phase 3: Implementation Planning │
│ │
│ Phase 3 is all about creating ONE SOURCE OF TRUTH! │
│ │
│ Before we can break down tasks and create Jira issues, │
│ we need to consolidate all your planning documents into │
│ a single, comprehensive specification. │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ 📄 Documents I'll consolidate: │
│ │
│ 1. Research Report (if exists) - Phase 0 findings │
│ 2. PRD - Your product requirements from Phase 1 │
│ 3. Tech Spec - Technical design from Phase 2 │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ 🔍 What I'll do: │
│ │
│ • Read each document SECTION BY SECTION │
│ • Find ALL contradictions between documents │
│ • Resolve conflicts using this hierarchy: │
│ Research > PRD > Tech Spec │
│ • Create ONE consolidated document (can be long!) │
│ • NO information will be lost │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ ⚠️ This is a BIG task - the consolidated document will │
│ contain EVERYTHING from all source documents. │
│ │
│ Ready to begin the consolidation process? │
│ │
│ Reply: "yes, begin" or ask questions first │
│ │
╰─────────────────────────────────────────────────────────────╯
Claude MUST wait for user confirmation before proceeding.
CRITICAL: Phase 3 Sub-Phase Structure
Phase 3 is divided into three mandatory sub-phases. Each must complete before proceeding.
┌─────────────────────────────────────────────────────────────────┐
│ PHASE 3 │
├─────────────────────────────────────────────────────────────────┤
│ │
│ Phase 3a Phase 3b Phase 3c │
│ ┌──────────────┐ ┌──────────────┐ ┌──────────────┐ │
│ │ Consolidation│────►│ Task │────►│ Jira │ │
│ │ & Validation │ │ Breakdown │ │ Population │ │
│ └──────────────┘ └──────────────┘ └──────────────┘ │
│ │ │ │ │
│ ▼ ▼ ▼ │
│ [User Approval] [Milestone] [Final Review] │
│ │
└─────────────────────────────────────────────────────────────────┘
Phase 3a: Consolidation & Validation
Purpose
Resolve all contradictions between PRD, Tech Spec, and Research before any planning begins.
CRITICAL: Section-by-Section Processing
WHY SECTION-BY-SECTION?
- Source documents are LARGE (PRD + Tech Spec + Research)
- Processing all at once will cause information loss
- Dependencies between sections must be tracked
- Each section needs focused contradiction analysis
Process
Step 1: Document Discovery & Section Mapping
First, Claude MUST read and map ALL sections from each document:
┌─────────────────────────────────────────────────────────────────┐
│ DOCUMENT SECTION MAPPING │
├─────────────────────────────────────────────────────────────────┤
│ │
│ Research Report (if exists): │
│ ├── Section 1: [Title] │
│ ├── Section 2: [Title] │
│ └── Section N: [Title] │
│ │
│ PRD: │
│ ├── Section 1: [Title] ──────────┐ │
│ ├── Section 2: [Title] ──────────┼── Dependencies │
│ ├── Section 3: [Title] ◄─────────┘ │
│ └── Section N: [Title] │
│ │
│ Tech Spec: │
│ ├── Section 1: [Title] ──► Related to PRD Section [X] │
│ ├── Section 2: [Title] ──► Related to PRD Section [Y] │
│ └── Section N: [Title] │
│ │
│ Cross-Document Dependencies: │
│ • PRD Section 3 depends on PRD Section 2 │
│ • Tech Spec Section 1 implements PRD Section 1 │
│ • Tech Spec Section 4 references Research Section 2 │
│ │
└─────────────────────────────────────────────────────────────────┘
Show this mapping to user and confirm before proceeding.
Step 2: Create Processing Order
Based on dependencies, create the consolidation order:
consolidation_order:
# Process in dependency order - foundations first
round_1_foundations:
- research_section: "Market Analysis"
related_prd: null
related_tech: null
- prd_section: "Problem Statement"
related_research: "Market Analysis"
related_tech: null
round_2_requirements:
- prd_section: "User Stories"
depends_on: ["Problem Statement"]
related_tech: "Component Design"
- prd_section: "Acceptance Criteria"
depends_on: ["User Stories"]
related_tech: "API Contracts"
round_3_technical:
- tech_section: "Architecture"
depends_on: ["User Stories"]
related_prd: "Non-Functional Requirements"
- tech_section: "Data Models"
depends_on: ["Architecture"]
related_prd: "User Stories"
round_4_implementation:
- tech_section: "API Contracts"
depends_on: ["Data Models"]
related_prd: "Acceptance Criteria"
- tech_section: "Security"
depends_on: ["Architecture", "API Contracts"]
related_prd: "Non-Functional Requirements"
Step 3: Section-by-Section Consolidation
For EACH section in processing order:
╭─────────────────────────────────────────────────────────────╮
│ 📖 PROCESSING SECTION: [Section Name] │
├─────────────────────────────────────────────────────────────┤
│ │
│ Source: [PRD/Tech Spec/Research] │
│ Related Sections: │
│ • [Document]: [Section] - [Relationship] │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ Content from this section: │
│ [Full section content] │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ Contradictions found with related sections: │
│ │
│ ⚠️ Contradiction #1: │
│ PRD says: "[text]" │
│ Tech Spec says: "[text]" │
│ Resolution: [Using PRD because...] │
│ │
│ ✓ No contradictions with: [list sections] │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ Consolidated output for this section: [preview] │
│ │
│ Continue to next section? [yes/pause] │
│ │
╰─────────────────────────────────────────────────────────────╯
Claude processes sections ONE AT A TIME, showing progress.
Step 4: Contradiction Analysis (Per Section)
| Contradiction Type | Example | Resolution Priority |
|---|---|---|
| Scope conflicts | PRD says "mobile-first", Tech Spec is desktop-only | 1 (Critical) |
| Technical conflicts | Different API designs for same feature | 1 (Critical) |
| Requirement gaps | PRD feature missing from Tech Spec | 2 (High) |
| Implementation conflicts | Different approaches to same problem | 2 (High) |
| Minor inconsistencies | Naming differences, format variations | 3 (Low) |
Step 5: Resolution Hierarchy
Resolution Authority (in order):
1. Research Report (if exists)
└── Data-driven findings override assumptions
2. PRD (Source of Truth)
└── Business requirements take precedence
3. Tech Spec
└── Technical constraints inform implementation
Resolution Template (logged for each):
## Contradiction #[N]
**Found In:** [PRD section] vs [Tech Spec section]
**Description:** [What conflicts]
**Resolution:** [How resolved]
**Authority Used:** [Research/PRD/Tech Spec]
**Rationale:** [Why this decision]
**Preserved Original Text:**
- PRD: "[original]"
- Tech Spec: "[original]"
Step 6: Progressive Document Building
As each section is processed, Claude WRITES to the consolidated document:
After processing Section 1:
→ Write Section 1 to consolidated-spec.md
After processing Section 2:
→ Append Section 2 to consolidated-spec.md
→ Update cross-references if needed
After processing Section N:
→ Append Section N to consolidated-spec.md
→ Final cross-reference check
→ Generate table of contents
This ensures NO information is lost even if context is long.
Progress Tracking
Claude MUST show progress after each section:
╭─────────────────────────────────────────────────────────────╮
│ 📊 CONSOLIDATION PROGRESS │
├─────────────────────────────────────────────────────────────┤
│ │
│ Sections Processed: [X] of [Total] │
│ ████████████░░░░░░░░░░░░░░░░░░░░░░░░ 35% │
│ │
│ Completed: │
│ ✓ Problem Statement │
│ ✓ User Stories │
│ ✓ Architecture Overview │
│ │
│ In Progress: │
│ → Data Models │
│ │
│ Remaining: │
│ ○ API Contracts │
│ ○ Security │
│ ○ Testing Strategy │
│ │
│ Contradictions Found: [N] (all resolved) │
│ Current Document Size: [X] words │
│ │
╰─────────────────────────────────────────────────────────────╯
Phase 3a Checkpoint
╭─────────────────────────────────────────────────────────────╮
│ PHASE 3a CHECKPOINT: Consolidation Complete │
├─────────────────────────────────────────────────────────────┤
│ │
│ Documents Analyzed: │
│ ✓ PRD: [path] ([X] sections) │
│ ✓ Tech Spec: [path] ([Y] sections) │
│ ✓ Research: [path or N/A] ([Z] sections) │
│ │
│ Total Sections Processed: [N] │
│ │
│ Contradictions Found: [N] │
│ ├── Critical: [count] - ALL RESOLVED │
│ ├── High: [count] - ALL RESOLVED │
│ └── Low: [count] - ALL RESOLVED │
│ │
│ Consolidated Document: │
│ 📄 [path] │
│ 📏 [word count] words │
│ 📑 [section count] sections │
│ │
│ Information Verification: │
│ ✓ All PRD sections included │
│ ✓ All Tech Spec sections included │
│ ✓ All Research findings included │
│ ✓ No information lost │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ ⚠️ USER APPROVAL REQUIRED │
│ │
│ Please review the consolidated document and confirm: │
│ │
│ Reply: "approve consolidation" to proceed to task breakdown│
│ Reply: "show section [X]" to review a specific section │
│ Reply: "change [X]" to request modifications │
│ │
╰─────────────────────────────────────────────────────────────╯
CRITICAL: Cannot proceed to Phase 3b without user approval.
Phase 3b: Task Breakdown
🚀 PHASE 3b ENTRY - MANDATORY MESSAGE AFTER CONSOLIDATION APPROVAL
When user approves the consolidated document, Claude MUST display:
╭─────────────────────────────────────────────────────────────╮
│ │
│ ✅ Consolidated Document Approved! │
│ │
│ Great! Now we have our SINGLE SOURCE OF TRUTH. │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ 📋 NEXT STEP: High-Level Task Breakdown │
│ │
│ Now I'm going to create a HIGH-LEVEL breakdown of all │
│ the work that needs to be done: │
│ │
│ • Epics (major feature areas) │
│ • Stories (user-facing functionality) │
│ • Tasks (technical work items) │
│ • Subtasks (atomic work units) │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ 🔄 THE PROCESS: │
│ │
│ Step 1: Create the breakdown structure │
│ (Epics → Stories → Tasks → Subtasks) │
│ │
│ Step 2: You review and approve the structure │
│ │
│ Step 3: Enter structure into Jira (or export) │
│ (Creates the issue hierarchy FIRST) │
│ │
│ Step 4: Enhance each Jira issue with FULL details │
│ (Adds all info from consolidated spec) │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ 💡 WHY THIS ORDER? │
│ │
│ Creating the Jira structure FIRST, then enhancing, │
│ ensures we don't miss any tasks and can track │
│ progress step-by-step through the full development. │
│ │
│ Ready to create the high-level breakdown? │
│ │
│ Reply: "yes, create breakdown" to proceed │
│ │
╰─────────────────────────────────────────────────────────────╯
Claude MUST wait for user confirmation before proceeding.
Purpose
Transform the consolidated specification into actionable development tasks.
Process
Step 1: Component Identification
Extract all implementable components from consolidated spec:
Component Categories:
├── Backend
│ ├── API Endpoints
│ ├── Database Models
│ ├── Business Logic
│ └── Integrations
├── Frontend
│ ├── Pages/Views
│ ├── Components
│ ├── State Management
│ └── API Integration
├── Infrastructure
│ ├── Database Setup
│ ├── Environment Config
│ └── CI/CD
└── Cross-Cutting
├── Authentication
├── Authorization
├── Logging/Monitoring
└── Error Handling
Step 2: Task Decomposition Rules
| Rule | Requirement |
|---|---|
| Size | Each task < 4 hours (prefer 1-2 hours) |
| Independence | Task should be completable without other tasks (unless dependency) |
| Testability | Task has clear acceptance criteria |
| Traceability | Task links to consolidated spec section |
Step 3: Estimation Guidelines
| Issue Type | Estimation Unit | Typical Range |
|---|---|---|
| Epic | Sprints | 1-3 sprints |
| Story | Story Points (Fibonacci) | 1, 2, 3, 5, 8, 13 |
| Task | Hours | 1-8 hours |
| Subtask | Minutes/Hours | 15 min - 4 hours |
Step 4: Dependency Mapping
graph TD
A[Database Schema] --> B[API Models]
B --> C[API Endpoints]
C --> D[Frontend Integration]
A --> E[Migrations]
E --> F[Seed Data]
Claude MUST:
- Identify blocking dependencies
- Mark critical path
- Flag parallel workstreams
Step 5: Sprint/Agile Planning
If using sprints:
sprint_planning:
sprint_length: [days]
team_capacity: [story points or hours]
velocity_reference: [historical or estimated]
sprint_1:
goal: "[Sprint goal]"
stories: [list]
total_points: [N]
sprint_2:
goal: "[Sprint goal]"
stories: [list]
total_points: [N]
Step 6: Risk Assessment
| Risk Category | Examples | Mitigation Required |
|---|---|---|
| Technical | New technology, complex integration | Yes |
| Dependency | External API, third-party service | Yes |
| Resource | Skill gaps, availability | Yes |
| Timeline | Hard deadlines, dependencies | Yes |
| Scope | Unclear requirements | Flag for clarification |
Risk Template:
### Risk: [Name]
- **Category:** [Technical/Dependency/Resource/Timeline/Scope]
- **Probability:** [High/Medium/Low]
- **Impact:** [High/Medium/Low]
- **Mitigation:** [Strategy]
- **Contingency:** [Backup plan]
- **Owner:** [Role responsible]
Phase 3b Checkpoint
╭─────────────────────────────────────────────────────────────╮
│ PHASE 3b CHECKPOINT: Task Breakdown Complete │
├─────────────────────────────────────────────────────────────┤
│ │
│ Task Summary: │
│ ├── Epics: [count] │
│ ├── Stories: [count] │
│ ├── Tasks: [count] │
│ └── Subtasks: [count] │
│ │
│ Estimation Summary: │
│ ├── Total Story Points: [N] │
│ ├── Total Hours: [N] │
│ └── Estimated Sprints: [N] │
│ │
│ Dependencies: │
│ ├── Critical Path Items: [count] │
│ └── Parallel Workstreams: [count] │
│ │
│ Risks Identified: [count] │
│ ├── High: [count] │
│ ├── Medium: [count] │
│ └── Low: [count] │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ Breakdown document saved to: │
│ 📄 docs/implementation-plan/task-breakdown-YYYY-MM-DD.md │
│ │
│ Ready for Phase 3c: Jira Population │
│ │
╰─────────────────────────────────────────────────────────────╯
Phase 3c: Jira Population
🚀 PHASE 3c ENTRY - MANDATORY JIRA QUESTION
After task breakdown is complete, Claude MUST ask:
╭─────────────────────────────────────────────────────────────╮
│ │
│ 📋 Task Breakdown Complete! │
│ │
│ Now it's time to create the full project structure │
│ so we can track every task and never miss anything. │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ 🔧 Do you have Jira set up for this project? │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ If YES (Jira available): │
│ │
│ I'll do this in TWO steps: │
│ │
│ STEP 1: Create the Jira STRUCTURE │
│ • Create all Epics │
│ • Create all Stories under Epics │
│ • Create all Tasks under Stories │
│ • Create all Subtasks under Tasks │
│ • Link all dependencies │
│ │
│ STEP 2: ENHANCE each issue with FULL details │
│ • Add complete descriptions │
│ • Add business context from PRD │
│ • Add technical notes from Tech Spec │
│ • Add acceptance criteria │
│ • Add test strategy │
│ • Reference consolidated spec sections │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ If NO (No Jira): │
│ │
│ I can export the breakdown to: │
│ • CSV file (for spreadsheet tracking) │
│ • JSON file (for import into other tools) │
│ │
│ ⚠️ RECOMMENDATION: │
│ │
│ For full SaaS development, we STRONGLY recommend │
│ using Jira (or similar tool) because: │
│ │
│ ✓ Never miss a task - everything is tracked │
│ ✓ Step-by-step completion visibility │
│ ✓ Dependencies are enforced │
│ ✓ Progress dashboards │
│ ✓ Sprint planning & velocity tracking │
│ ✓ Better team collaboration │
│ │
│ Building a complete SaaS has HUNDREDS of tasks. │
│ Without proper tracking, tasks WILL be forgotten. │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ Please choose: │
│ │
│ Reply: "use jira" - I'll create structure then enhance │
│ Reply: "export csv" - I'll create CSV file │
│ Reply: "export json" - I'll create JSON file │
│ Reply: "setup jira first" - Let's configure Jira MCP │
│ │
╰─────────────────────────────────────────────────────────────╯
Claude MUST wait for user choice before proceeding.
Purpose
Create Jira issues with ALL information from the consolidated document.
TWO-STEP JIRA POPULATION PROCESS
CRITICAL: Structure FIRST, then Enhance.
This ensures:
- All tasks exist in Jira before we start enhancing
- Dependencies can be properly linked
- No tasks are forgotten during enhancement
- Progress is visible immediately
STEP 1: Create Jira Structure (Skeleton)
1.1 Create All Epics First
For each Epic in breakdown:
→ Create Epic with:
• Summary (title only)
• Basic description (1-2 sentences)
• Priority
• Labels
→ Store Epic key for Story creation
Progress Display:
╭─────────────────────────────────────────────────────────────╮
│ 📦 Creating Jira Structure - STEP 1 │
├─────────────────────────────────────────────────────────────┤
│ │
│ Creating Epics... │
│ ████████████████████████████████████████ 100% │
│ │
│ ✓ PROJ-1: User Authentication Epic │
│ ✓ PROJ-2: Dashboard Epic │
│ ✓ PROJ-3: Payment Integration Epic │
│ │
│ Epics Created: 3 of 3 │
│ │
╰─────────────────────────────────────────────────────────────╯
1.2 Create All Stories Under Epics
For each Story in breakdown:
→ Create Story with:
• Summary (title)
• Parent Epic link
• Story Points estimate
• Priority
→ Store Story key for Task creation
1.3 Create All Tasks Under Stories
For each Task in breakdown:
→ Create Task with:
• Summary (title)
• Parent Story link
• Hour estimate
• Priority
→ Store Task key for Subtask creation
1.4 Create All Subtasks Under Tasks
For each Subtask in breakdown:
→ Create Subtask with:
• Summary (title)
• Parent Task link
• Hour estimate
1.5 Link All Dependencies
For each dependency in breakdown:
→ Create issue link:
• "is blocked by" / "blocks"
• Link source and target issues
Structure Complete Display:
╭─────────────────────────────────────────────────────────────╮
│ ✅ STEP 1 COMPLETE: Jira Structure Created │
├─────────────────────────────────────────────────────────────┤
│ │
│ Issues Created: │
│ ├── Epics: 3 │
│ │ ├── PROJ-1: User Authentication │
│ │ ├── PROJ-2: Dashboard │
│ │ └── PROJ-3: Payment Integration │
│ ├── Stories: 12 │
│ ├── Tasks: 45 │
│ └── Subtasks: 89 │
│ │
│ Dependencies Linked: 34 │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ The skeleton is ready! All issues exist in Jira. │
│ │
│ Now proceeding to STEP 2: Enhance with full details... │
│ │
╰─────────────────────────────────────────────────────────────╯
STEP 2: Enhance Each Issue With Full Details
Now that all issues exist, enhance them ONE BY ONE with full information from the consolidated spec.
2.1 Enhancement Process
For each issue (in hierarchy order):
1. Read corresponding section from consolidated spec
2. Update issue description with:
• Full business context (from PRD)
• Technical implementation details (from Tech Spec)
• Acceptance criteria (complete list)
• Technical notes & gotchas
• Test strategy
• Reference to consolidated spec section
3. Show progress
2.2 Enhancement Template
## Summary
[What this issue accomplishes]
## Business Context
[Why this matters - from PRD section of consolidated spec]
## Technical Implementation
[How to implement - from Tech Spec section of consolidated spec]
## Acceptance Criteria
- [ ] [Criterion 1 - from consolidated spec]
- [ ] [Criterion 2 - from consolidated spec]
- [ ] [Criterion 3 - from consolidated spec]
## Technical Notes
[Implementation details, gotchas, considerations from Tech Spec]
## Dependencies
- Blocks: [issue keys - already linked]
- Blocked By: [issue keys - already linked]
## Test Strategy
[How this will be tested - from consolidated spec]
## Reference
📄 Consolidated Spec: [doc path]
📑 Section: [section name]
2.3 Enhancement Progress Display
╭─────────────────────────────────────────────────────────────╮
│ 📝 STEP 2: Enhancing Issues With Full Details │
├─────────────────────────────────────────────────────────────┤
│ │
│ Progress: 23 of 149 issues enhanced │
│ ███████░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░░ 15% │
│ │
│ Currently enhancing: │
│ → PROJ-15: Implement password hashing │
│ Source: Consolidated Spec Section 4.2.1 │
│ │
│ Recently completed: │
│ ✓ PROJ-14: Create user database schema │
│ ✓ PROJ-13: Design authentication flow │
│ ✓ PROJ-12: Define user data model │
│ │
│ Remaining: 126 issues │
│ │
╰─────────────────────────────────────────────────────────────╯
Alternative: CSV/JSON Export
If user chooses export instead of Jira:
CSV Export Format
Type,Key,Summary,Description,Parent,Story Points,Hours,Priority,Dependencies,Spec Reference
Epic,,User Authentication,"Full auth system",,,,High,,Section 4
Story,,[Epic] Login Flow,"User login",[Epic-1],5,,High,,[Epic] 4.1
Task,,[Story] Password hashing,"Bcrypt impl",[Story-1],,4,Medium,,[Story] 4.1.1
Subtask,,[Task] Add bcrypt lib,"npm install",[Task-1],,0.5,Low,,[Task] 4.1.1.1
JSON Export Format
{
"project": "[Feature Name]",
"exported_at": "YYYY-MM-DD",
"consolidated_spec": "path/to/consolidated-spec.md",
"hierarchy": {
"epics": [
{
"summary": "User Authentication",
"description": "Full authentication system...",
"spec_reference": "Section 4",
"stories": [
{
"summary": "Login Flow",
"story_points": 5,
"spec_reference": "Section 4.1",
"tasks": [...]
}
]
}
]
}
}
Export Complete Display:
╭─────────────────────────────────────────────────────────────╮
│ 📁 Export Complete │
├─────────────────────────────────────────────────────────────┤
│ │
│ Files created: │
│ │
│ 📄 docs/implementation-plan/jira-export-YYYY-MM-DD.csv │
│ 📄 docs/implementation-plan/jira-export-YYYY-MM-DD.json │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ ⚠️ REMINDER: │
│ │
│ For better tracking during development, consider: │
│ │
│ • Import this into Jira, Trello, or Linear │
│ • Use a spreadsheet with status columns │
│ • Set up the Jira MCP for automated tracking │
│ │
│ Run "/setup jira" when ready to configure Jira. │
│ │
╰─────────────────────────────────────────────────────────────╯
Phase 3c Checkpoint (Final)
╭─────────────────────────────────────────────────────────────╮
│ PHASE 3c CHECKPOINT: Jira Population Complete │
├─────────────────────────────────────────────────────────────┤
│ │
│ Jira Issues Created & Enhanced: │
│ ├── Epics: [count] - [list keys] │
│ ├── Stories: [count] │
│ ├── Tasks: [count] │
│ └── Subtasks: [count] │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ STEP 1 - Structure: ✅ Complete │
│ • All issues created │
│ • All dependencies linked │
│ • Hierarchy verified │
│ │
│ STEP 2 - Enhancement: ✅ Complete │
│ • All descriptions populated │
│ • All acceptance criteria added │
│ • All technical notes included │
│ • All spec references linked │
│ │
│ ───────────────────────────────────────────────────────── │
│ │
│ Information Validation: │
│ ✓ All issues have FULL descriptions │
│ ✓ All issues have acceptance criteria │
│ ✓ All issues have estimates │
│ ✓ All dependencies linked │
│ ✓ All issues reference consolidated spec │
│ │
│ Sprint Assignment: │
│ ├── Sprint 1: [count] issues │
│ ├── Sprint 2: [count] issues │
│ └── Backlog: [count] issues │
│ │
│ ═══════════════════════════════════════════════════════ │
│ │
│ 🎉 PHASE 3 COMPLETE! │
│ │
│ You now have: │
│ ✓ ONE consolidated source of truth │
│ ✓ Complete task breakdown │
│ ✓ Full Jira structure with detailed issues │
│ ✓ Every task traceable to requirements │
│ │
│ Ready for Phase 4 (Development)! │
│ │
│ Run: /aid-start to begin development │
│ │
╰─────────────────────────────────────────────────────────────╯
Output Artifacts
Required Documents
| Artifact | Location | Format |
|---|---|---|
| Consolidated Spec | docs/implementation-plan/consolidated-spec-YYYY-MM-DD-[feature].md |
Markdown |
| Contradiction Log | docs/implementation-plan/contradiction-log-YYYY-MM-DD.md |
Markdown |
| Task Breakdown | docs/implementation-plan/task-breakdown-YYYY-MM-DD-[feature].md |
Markdown |
| Jira Export | docs/implementation-plan/jira-export-YYYY-MM-DD.json |
JSON |
| Risk Assessment | docs/implementation-plan/risks-YYYY-MM-DD.md |
Markdown |
| Sprint Plan | docs/implementation-plan/sprint-plan-YYYY-MM-DD.yaml |
YAML |
Machine-Readable Output
All documents have companion JSON/YAML files for automation:
docs/implementation-plan/
├── consolidated-spec-2024-12-15-user-auth.md
├── consolidated-spec-2024-12-15-user-auth.json # Machine-readable
├── task-breakdown-2024-12-15-user-auth.md
├── task-breakdown-2024-12-15-user-auth.json # Machine-readable
├── sprint-plan-2024-12-15.yaml # Machine-readable
└── risks-2024-12-15.yaml # Machine-readable
Exit Criteria (Phase 3 → Phase 4)
Mandatory Checklist
Phase 3a Complete
- All input documents analyzed (PRD, Tech Spec, Research)
- All contradictions identified and resolved
- Consolidated master document created
- User approved consolidation
Phase 3b Complete
- All tasks broken down (< 4 hours each)
- All tasks have acceptance criteria
- Dependencies mapped with critical path
- Risk assessment complete with mitigations
- Sprint/iteration plan defined
Phase 3c Complete
- Jira issues created (or export file ready)
- All issues have full descriptions from consolidated spec
- All issues have estimates
- Dependencies linked between issues
- Issues assigned to sprints
Quality Gates
- Sub-agent review PASSED
- User feedback collected via
/aid end
Commands
| Command | Purpose |
|---|---|
/impl-plan |
Start Phase 3 workflow |
/consolidate |
Run Phase 3a consolidation |
/breakdown |
Run Phase 3b task breakdown |
/populate-jira |
Run Phase 3c Jira population |
/phase 3a |
Check Phase 3a status |
/phase 3b |
Check Phase 3b status |
/phase 3c |
Check Phase 3c status |
Integration with Other Skills
| Skill | Integration Point |
|---|---|
phase-enforcement |
Validates sub-phase transitions |
system-architect |
Tech Spec input for Phase 3a |
aid-prd |
PRD input for Phase 3a |
test-driven |
Test strategy feeds into Phase 3b tasks |
code-review |
Task structure informs review scope |
State Tracking
Phase 3 uses extended state in .aid/state.json:
{
"current_phase": 3,
"phase_name": "Implementation Plan",
"sub_phase": "3b",
"sub_phase_name": "Task Breakdown",
"phase_3_state": {
"3a": {
"status": "complete",
"contradictions_found": 5,
"contradictions_resolved": 5,
"consolidated_doc": "docs/implementation-plan/consolidated-spec-2024-12-15-user-auth.md",
"user_approved": true,
"approved_at": "2024-12-15T10:00:00Z"
},
"3b": {
"status": "in_progress",
"tasks_created": 24,
"risks_identified": 3,
"sprint_plan_ready": false
},
"3c": {
"status": "locked",
"jira_issues_created": 0
}
}
}