refactor-risk-assess

[代码质量] 评估建议重构变更的风险级别。用于评估依赖关系、影响范围、回滚难度,并确定是否可以安全继续变更。

📖 中文导读:[代码质量] 评估建议重构变更的风险级别。用于评估依赖关系、影响范围、回滚难度,并确定是否可以安全继续变更。 以下正文为该技能的原始 SKILL.md 内容(英文),上方安装命令可直接使用。

name: refactor-risk-assess description: "[Code Quality] Evaluates risk level of proposed refactoring changes. Use to assess dependencies, blast radius, rollback difficulty, and determine if changes are safe to proceed."

Refactor: Risk Assessment

Evaluate and mitigate risks before executing changes.

Risk Dimensions

1. Blast Radius

Level Description Example
LOW Single file, private methods Rename local variable
MEDIUM Multiple files, internal APIs Extract helper class
HIGH Public APIs, many dependents Change interface signature

2. Reversibility

Level Description
LOW RISK Git revert fixes everything
MEDIUM Requires coordinated rollback
HIGH Data migration, external deps

3. Test Coverage

Coverage Risk Impact
> 80% Safe to proceed
50-80% Add tests first
< 50% HIGH RISK

Go/No-Go Criteria

PROCEED if: Test coverage adequate, Blast radius understood, Rollback plan exists BLOCK if: Critical path no tests, Public API change without review